The Water Street Project
 
  • 1704 Water Street
  • The Backyard
  • Kitchen after electric
  • Kitchen after pull down of pegboard
  • 2nd Day
  • 3rd Day
  • 2-26-98 Kitchen
  • 2-26-98 Bedroom
  • 3-1-98
  • 3-4-98 Entrance
  • 3-4-98 Kitchen
  • 3-4-98 Bedroom
  • Kitchen on Friday the 13th 1-13-98
  • Long Pond from Howard's yard
  • 3-18-98
  • End of 4th Week (almost Done,3-20-98)
  • Handles & Club Car